PROTON PROJECT

PROTON PROJECT 

Pump Exchange system

Pump Exchange system is use in Proton Tanjong Malim Painting Shop. 1 panel is connected to 2 pump use for production. Only one pump work at a time while the other one will take over the job as pump 1 material complete or stop. There were limit switch install at each pump for the pump level monitor and proximity sensor to count the pump stroke. Pump will stop and red light on panel will blink if the stroke reach in limit in a minute as a sign there are issues with pump.

Hardener Pump Power Panel

Pump Power Panel is a small dB located outside the hardener pump room. It is located outside the room as inside pump room equipment need ATEX Certification to be install. Each power cable is terminated to an explosion prove isolator before entering the hardener pump power terminal.

Pump Mixture Power Panel (Ecodose 2K)

There are seven Ecodose 2K Panels located in clean room at the left and right side of the paint shop line production. Power dB for the panel is located outside of the room.