PHN-TGM-FRONT AXIAL REAR AXIAL WELDING LINE INSTALLATION
The project involves receiving, unloading, unboxing, and installation of 9-unit 14ft container of welding station, welding equipment, Panasonic robot, controller panel and jig.
It starting from clearing the area and epoxy flooring work until machine power up. Besides, Slab preparation for welding gas tank location and other utilities such clean water and power supply also in the scope complete with safety gate around the slab area.