OUR PROJECTS

D74A SPOT ROBOT WELDING STATION INSTALLATION D74A station installation of a spot-welding robot cell installed with its water supply & return
SUPPLY AND INSTALL VOLTAGE STABILIZER Unloading and Unpacking Installing and Inspecting
CCB JIG AND MIG WELDING ROBOT INSTALLATION AT SHAH ALAM Unloading and Unpacking Robot Installation Work Final Completion View Jig
UTILITY FACILITY FOR AUTOMATED PRODUCTION LINE. Utility Line TVAA is an M&E work consist of 24 welding robot cell. Each
SEALANT PUMP CABLING WORK Sealant Pump Wiring Work HPA Sealant Pump Wiring Work for Body Shop. The scope is to
M&E WORK AND STATION INSTALLATION OF SPOT WELDING ROBOT LINE  This project consist of Mechanical and Electrical work as preparation
AUTOMATED STORAGE AND RETRIEVAL SYSTEM Automated Storage and Retrieval System is widely use in PAPAMY warehouse. The warehouse consists of
COMPRESSOR SERVICING AT SUBANG Compressor Servicing. It is done annually and consists of changing the air/oil filter kit, check valve
PAINT SHOP UPGRADE WORK AT TANJONG MALIMPump Exchange system Pump Exchange system is use in Proton Tanjong Malim Painting Shop.
MSSB INSTALLATION AND MACHINE POWER CABLING WORK It’s a production line of  Hood Hinge line. It consists of riveting machine