The process commenced with the dismantling of the bolt and nut feeding units at Bukit Beruntung factory. Subsequently, the machinery and structural components were relocated and loaded at Rasa factory, where installation works were carried out until the spot-welding equipment was successfully power up and tested.
As part of the station setup, supporting goalpost frames were assembled, and the working area was upgraded with ventilation fans and overhead lighting to enhance operational safety and efficiency.