Deprecated: Function WP_Dependencies->add_data() was called with an argument that is deprecated since version 6.9.0! IE conditional comments are ignored by all supported browsers. in /opt/bitnami/wordpress/wp-includes/functions.php on line 6131
FRONT AXIAL REAR AXIAL MIG ROBOT WELDING LINE INSTALLATION AT TANJONG MALIM - GTG Engineering Works Sdn. Bhd.

FRONT AXIAL REAR AXIAL MIG ROBOT WELDING LINE INSTALLATION AT TANJONG MALIM

FRONT AXIAL REAR AXIAL MIG ROBOT WELDING LINE INSTALLATION AT TANJONG MALIM

The project involves receiving, unloading, unboxing, and installation of 9-unit 14ft container of welding station, welding equipment, Panasonic robot, controller panel and jig.

It starting from clearing the area and epoxy flooring work until machine power up. Besides, Slab preparation for welding gas tank location and other utilities such clean water and power supply also in the scope complete with safety gate around the slab area.
Scroll to Top